construction progress
2021
November
October
April
May
June
July
August

HOUSE :

  • Concreting of walls and pylons of 2 sections, concreting of pylons and columns of 1 section. Concreting of the ramp, slabs of the basement floor of the 1st section.

IMPROVEMENT:

  • Painting of playgrounds 1 and 2, sports ground, treadmill.
  • The installation is covered with labradorite on a retaining wall (embankment).
  • Installing sidewalk benches.
  • Installing stainless steel pillars on the sidewalk.
  • Installation of granite tiles on the embankment.

We regularly report on what is happening on the construction site:

  • Concreting of the foundation slab of the 2nd section.
  • Concreting of walls, columns, pylons, walls of the entrance group.

This is about the house.
As for the improvement, now the following are being carried out:

  • Installation of granite tiles on the embankment.
  • Installation of stainless steel pillars on the sidewalk from the road.
  • Laying of corrugation and cable for lighting poles and illumination of trees from the road.
  • There is a drilling rig that performs work on the construction of the sheet pile.
  • The construction of the retaining wall of the shoreline is nearing completion and the construction of concrete stairs has been completed.
  • Installation of advertising structures with a total area of 6 thousand square meters with night lighting has been completed.
  • Infrastructure construction works have been completed: a road-descent to boats has been arranged, a car park has been built.
  • The development of the pit is nearing completion
  • The construction of the retaining wall of the shoreline is nearing completion and the construction of concrete stairs has been completed.
  • Installation of advertising structures with a total area of 6 thousand square meters with night lighting has been completed.
  • Infrastructure construction works have been completed: a road-descent to boats has been arranged, a car park has been built.
  • Currently, works are underway to improve the waterfront, where very soon there will be: - racetrack; - cycle path; - summer terrace of the restaurant; - pontoon for fishing; - quay for yachts and boats.
  • Builders are already preparing it for the installation of the base for the finish (granite slabs).
  • Works on a pile field of the base are carried out.
  • Work is underway to equip the roadway.
  • We also want to remind you that due to the presence of above-ground and underground parking lots, courtyards are free of cars.
  • Work on the foundation pile field is currently being completed.
  • In parallel, work is underway to install waterproofing of the foundation slab.
  • A playground has been installed. We are improving and modernizing the area around it.
  • We are actively working on the waterfront.
  • The final stage of foundation arrangement.